FIRST UNITED METHODIST CHURCH

Addition and Renovation

The First United Methodist Church, a steadfast community of faith in downtown Kalamazoo since 1833, expanded and renovated to offer more effective missions and ministries. The $3.5 million project began in April 2008. The 7,000-square-foot addition includes classrooms, storage, and a portico. Renovations included the kitchen, social hall, narthex, and classrooms, among other spaces.

The church did not relocate daycare, Sunday school and worship services, or other activities during construction. Therefore, it was imperative that the daily operation of the church continue without interruption throughout construction. To preserve the aesthetic of the existing building the new addition was constructed out of the same materials—limestone and slate—as the original church. An unusually cold and wet winter also challenged the construction team and worked against the construction schedule.

To combat these challenges, Miller Davis implemented flexible construction sequencing and staffing adapted to the Owner’s needs and the extreme weather conditions. Creative problem-solving and enhanced on-site coordination were absolutely critical. In February, a heated exterior enclosure was constructed to allow installation of the limestone facade, which required on-site final detailing by hand. Temporary hydronic heating units were also installed throughout the new addition to maintain an air temperature of 50 degrees for material finishes. The project was completed in June 2009.

PROJECT DETAILS
Location:Kalamazoo, MI
Categories:Nonprofit
First United Methodist Church
First United Methodist Church
First United Methodist Church
First United Methodist Church
First United Methodist Church
First United Methodist Church